Greenlea Clinic

We provided a full refurbishment package for the Greenlea Clinic. The job itself had to be completed in stages as the Clinic had to remain open and continue to operate. A new reception was constructed along with four new surgeries.

All rooms were completely fitted out and finished to the highest standards. Disabled toilets were also implemented.

Physiotherapist Clinic, Ranelagh

This existing physiotherapist clinic, which was located on Dunville Ave was in serious need of a refurbishment. The clinic which was based on the first floor, shared the space with an Architect and a marketing firm. This project had to be phased because both the Architect and especially the Physiotherapist needed to be operational during the project. The plan was to move the Architect (who was the Architect on the job, Suzanne McDonald of McDonald Vagge Architects) into the Marketing firms (who vacated the premises) office space. This paved way for a bespoke reception and one treatment room to be fitted in the existing Architects office. When this was completed the existing reception was set up in its new home to allow a temporary treatment room to be set up in the existing reception room.

 

The next phase of the project consisted of renovating the room of the existing reception, which involved blocking up the existing entrance of the room (which was from the existing reception) and creation two new entrances to the hallway. The room was the separated by a stud and finished to a high standard. The hallway was also re-designed to house a bespoke disabled toilet and wash area. The final phase of the project then started when the other two treatment rooms were operational and it consisted of turning the existing reception room into a gym / treatment area along with general decoration and building a bespoke sign out the front of the clinic.

O’Sullivan’s Pharmacy

O’Sullivan’s Pharmacy approached us enquiring if we could extend their existing premises while their business kept operating, we told them that this would not be a problem. We stripped out the existing building and upgraded the first floor so it was in correspondence with fire and safety regulations.

Inside, we fitted out the shop with all of the features of a modern pharmacy using tiled floors and integrated wall cabinets / shelving to save space. A new front was also incorporated to the outside of the pharmacy.

Terenure Rugby Club

We provided a complete fit out for the member’s lounge and the bar area for Terenure College rugby football club. The old bar and member’s area’s, which were dated and tired, were completely stripped and the new facilities implemented.

The fit-out included a new hardwood bar, complete fit out behind the bar, bar shutters, hardwood flooring (to accommodate for a ballroom area), bar seating, new lighting, new glazed windows and a new security system.

The kitchen and toilets in the club were both completely re-fitted to the highest standards. A new heating and hot water system were also integrated.

Mortons Ranelagh

We implemented a complete fit out of Morton’s supermarket based in Ranelagh. Before the refurbishment could take place, we extended the shop and expanded it internally to three floors with a staff canteen and a stock storage area. Throughout the shop, new tiled floors, shelving units and lighting systems were incorporated.

A new delicatessen, meat counter and off licence were included. Along with this, a coffee shop with seating areas was also constructed.

Mortons – Hatch Street

Based in an existing railway arch, Morton’s Supermarket Hatch Street was stone shell, which was brought to life by Joe Dunne Construction.

We inserted a complete fit out package which included delicatessen counters, shelving systems, counter tops, tiled floors, a new kitchen, suspended lighting features, air conditioning / heating system and a state of the art office canopy over the delicatessen counter which brought this old railway arch to life.